Elevated Toll Road 36.4 km
Project Summary
Project Code | : | JSMR-JJC422-02TOLR |
Project | : | Elevated Toll Road 36.4 km |
Sector | : | Road |
S&E Categorization | : | B-2 |
Location | : | Above the existing Jakarta - Cikampek toll road project |
Status | : | Active |
First Disclosure Date | : | July 2018 |
Summary
IIIF participated in the Syndication Facility that intended to finance elevated toll road project from Jakarta to Cikampek for 36.4 km. This Project is categorized as one of National Strategic Projects (Proyek Strategis Nasional (“PSN”)) released in 2017 through Presidential Decree No 58. With this elevated toll road, it is expected that the traffic load on the existing Jakarta-Cikampek toll road, which is now too crowded, can be reduced. This will have a positive impact because traffic load reduction will also reduce fossil fuel consumption.
Project Main S&E Document
Amdal (only available in bahasa)
For further inquiry, please contact us at: [email protected]
Last Update: January 2022