Madura Strait Floating Production Unit Project
Project Summary
Project Code | : | XTSU-TOI263-08OGRF |
Project | : | Oil and Gas |
Sector | : | Oil and Gas |
S&E Categorization | : | B |
Location | : | Madura |
Status | : | Closed in January 2023 |
First Disclosure Date | : | November 2021 |
Summary
IIF to finance design, procurement, construction, commissioning, and performance test of Floating Production Unit (“FPU”) that will be located in Madura Strait. The FPU will become the gas receiving and processing facility with installed capacity up to 175 MMSCFD gas (million standard cubic feet per day) sourced from offshore gas field in Madura Strait prior to be delivered to the customer in East Java via subsea East Java Gas Pipeline (“EJGP”) managed by Pertamina.