Skip to content
ID EN
  • Home
  • About IIF
    • Overview
    • Shareholders
    • Vision and Mission
    • Our Strategy
    • Organization
      • Organization Structure
      • Board of Commissioners
      • Executive Committee
    • Human Capital
  • Business
    • Product and Services
      • Key Differentiators
      • Investment Business
      • Advisory Business
      • Sectors
      • Public-Private Partnership
    • Portfolio & Project
      • Portfolio’s Chart
      • Projects Map
    • Policy Brief
  • Social & Environmental
    • IIF’s S&E Principles
    • S&E Management System
    • Project Summary
  • Investor Relations
    • Financial Informations
      • Annual Reports
      • Sustainability Report
      • Financial Statements
    • Ratings
    • Financial Highlights
    • Capital Market Professionals
    • Bonds and Perpetual Notes
    • Corporate Governance
      • IIF’s Whistleblowing System
      • Corporate Secretary & Audit
      • Risk Management
      • Committees
      • Other Documents
  • News
    • Announcement
    • News Updates
      • Event Gallery
      • Press Release
  • CSR
  • Career
  • Contact
">

Social & Environmental

  • IIF's S&E Principles
  • S&E Management System
  • Project Summary

Mini Hydro Power Plant – South Bolaang Mongondow, North Sulawesi

Project Summary

Project Code:XCEP-SHE294-07RPWR
Project:2 x 1,75 MW Mini Hydro Power Plant (MHPP)
Sector:Power Generation – Mini Hydro
S&E Categorization:B
Location:South Bolaang Mongondow Regency, North Sulawesi Province
Status:Active
First Disclosure Date:December 2021

Summary

In December 2021, IIF agreed to provide a Senior Term Facility Loan to support the development of 2 X 1,75 MW Mini Hydro Power Plant (MHPP) located in South Bolaang Mongondow Regency, North Sulawesi Province. The MHPP is a run-off river hydroelectric system where the plant harvests the energy from flowing water of Sinandaka River to generate electricity in the absence of a large dam and reservoir. The project signed a Power Purchase Agreement (PPA) with PLN in 2011 and considered as part of government commitment to accelerate the renewable energy mix in Indonesia, targeted to reach 23% by 2025. Under the PPA, the plant will support PLN Suluttenggo region that covers the area of Gorontalo with a connection directly to local demand of South Bolaang Mongondow through Kotamobagu branch. The plant will be connected to Kotamobagu Branch, particularly the Molibagu sub-Branch. Molibagu sub-Branch is currently supplied by Diesel Power Plants. The Social and Environmental Due Diligence (SEDD) has been conducted by independent consultant and categorize the project as Category B Project. IIF’s participation in this project shows its continuous contribution to the acceleration of electricity infrastructure development in Indonesia especially from renewable energy part.

Project S&E Documents

Project S&E Document

For further inquiry, please contact us at: [email protected]

Last Update: December 2021

PT Indonesia Infrastructure Finance

Prosperity Tower 53rd – 55th Floor, District 8
Sudirman Central Business District, Lot 28
Jl. Jend. Sudirman Kav. 52-53, Jakarta 12190, Indonesia

Phone : (+62) 21 5082 6600 - Fax : (+62) 21 5082 6601

Email : [email protected]

Follow us:
© Copyright 2019 Indonesia Infrastructure Finance. All rights reserved.
  • Imprint
  • Cookies
  • Contact
  • Terms of Use

IIF File Request Form

×
This field is required
Invalid Email ID
I hereby request access to Investor Update 1Q21 given by IIF. Thank you.

IFF File Request Form

×
Thank you for your request, we will get back to you shortly through [email protected]